Aurizon (ARZ) Reports 80.8 Metres at 1.21 Grams of Gold Per Tonne
VANCOUVER, Nov. 4 /PRNewswire/ – Aurizon Mines Ltd. (TSX:ARZ.to – News) (“Aurizon”) is pleased to announce results from the first thirteen (13) drill holes at the Marban Block property, located in the Malartic gold camp, in the Abitibi region of Quebec.
Significant intersections include:
- 11.89 grams of gold per tonne over 2.4 metres (MB-10-104), - 5.13 grams of gold per tonne over 6.0 metres (MB-10-106), - 80.8 metres averaging 1.21 grams of gold per tonne, including 11.06 grams of gold per tonne over 3.6 metres (MB-10-107), - 7.81 grams of gold per tonne over 4.3 metres (MB-10-110), and - 33.19 grams of gold per tonne over 2.4 metres (MB-10-117).
The drill holes were collared within the central portion of the Marban gold deposit and tested the entire width of the Marban Mine Sequence from surface to a vertical depth of 300 metres. The Mine Sequence, consisting of deformed mafic volcanic rocks, is approximately 250 metres wide in this area and hosts several important sulphide and gold mineralised shear zones extending along a 1.3 kilometre strike length. The results from the initial thirteen (13) holes at Marban are encouraging and confirm the potential for both bulk tonnage gold mineralisation and higher-grade ore shoots at shallow depths.
Aurizon Option
Aurizon can earn up to a 65% interest the Marban Block property under the terms of an option and joint venture agreement dated July 5, 2010 between the Company and NioGold Mining Corporation (“NioGold”). The initial 50% interest can be earned by incurring expenditures of C$20 million over three years, completing an updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for 50% of the total gold ounces defined by the mineral resource estimate. NioGold is the project operator during the initial earn-in period (see Aurizon news release dated July 6, 2010).
The first year program under the terms of the option agreement includes 50,000 metres of diamond drilling. The program is mainly directed at better defining and increasing the near surface gold mineral resources at the Marban and Norlartic deposits of the Marban Block. The Marban Block includes the Gold Hawk, First Canadian, Norlartic and Marban properties and consists of forty-two (42) mining claims and three (3) mining concessions covering 976 hectares in the heart of the Malartic gold mining camp, Abitibi region, Quebec (see Aurizon news release dated July 6, 2010). Two drill rigs are currently in operation on the Marban deposit of the Marban Block.
Assay results are summarized in the table below. Marban 2010 Drilling Results ------------------------------------------------------------------------- Hole # Line Station Az Dip Depth From (metres) ------------------------------------------------------------------------- MB-10-102 0+50 W 0+75 S N180 degrees -45 degrees 225.0 45.0 144.0 including 160.5 ------------------------------------------------------------------------- MB-10-103 0+50 W 1+45 S N180 degrees -45 degrees 179.0 99.0 ------------------------------------------------------------------------- MB-10-104 0+45 W 0+13 S N180 degrees -47 degrees 304.0 124.3 160.8 ------------------------------------------------------------------------- MB-10-105 0+50 W 1+45 N N180 degrees -45 degrees 304.0 203.4 265.7 283.1 including 286.7 ------------------------------------------------------------------------- MB-10-106 0+50 W 2+15 N N180 degrees -45 degrees 444.0 224.7 254.3 including 274.0 303.1 including 309.1 353.5 including 361.9 385.7 including 398.9 ------------------------------------------------------------------------- MB-10-107 0+50 E 2+35 N N180 degrees -55 degrees 513.0 287.2 including 323.6 378.6 427.9 ------------------------------------------------------------------------- MB-10-110 0+00 0+40 S N180 degrees -50 degrees 253.0 202.0 ------------------------------------------------------------------------- MB-10-111 0+50 E 0+80 S N180 degrees -55 degrees 275.0 48.3 140.8 including 179.4 ------------------------------------------------------------------------- MB-10-112 0+50 E 1+40 S N180 degrees -55 degrees 224.5 147.2 ------------------------------------------------------------------------- MB-10-113 1+00 E 0+75 S N180 degrees -55 degrees 231.0 101.0 203.3 ------------------------------------------------------------------------- MB-10-114 0+50 E 1+05 N N180 degrees -56 degrees 374.0 267.0 334.1 including 335.3 including 353.6 ------------------------------------------------------------------------- MB-10-115 0+50 E 0+20 S N180 degrees -55 degrees 228.6 178.8 including 187.0 ------------------------------------------------------------------------- MB-10-117 0+02 W 0+43 N N180 degrees -52 degrees 248.0 115.0 ------------------------------------------------------------------------- ------------------------------------------------------------------------- Hole # To Length Grade (grams of (metres) (metres) gold per tonne) Zone(s) ------------------------------------------------------------------------- MB-10-102 46.2 1.2 5.14 2 168.5 24.5 0.73 A-T 168.5 8.0 1.78 T ------------------------------------------------------------------------- MB-10-103 100.2 1.2 4.08 T ------------------------------------------------------------------------- MB-10-104 126.1 1.8 2.01 E 163.2 2.4 11.89 D1 ------------------------------------------------------------------------- MB-10-105 221.5 18.1 1.32 E-Z 266.9 1.2 7.46 D1 304.0 20.9 1.36 B-C 287.9 1.2 13.05 B ------------------------------------------------------------------------- MB-10-106 225.9 1.2 6.40 2 277.6 23.3 1.86 EZ 275.2 1.2 28.80 E 317.2 14.1 2.47 D1 315.1 6.0 5.13 D1 374.0 20.5 1.89 C 367.2 5.3 4.30 C1 418.9 33.2 1.22 A-T 407.0 8.1 2.31 T ------------------------------------------------------------------------- MB-10-107 368.0 80.8 1.21 B-D1-E-X 327.2 3.6 11.06 D1 391.0 12.4 0.44 C2 460.8 32.9 0.42 C1-A-T ------------------------------------------------------------------------- MB-10-110 206.3 4.3 7.81 T ------------------------------------------------------------------------- MB-10-111 49.5 1.2 6.51 2 191.5 50.7 0.56 A-B-C-D1-T 189.4 10.0 1.64 T ------------------------------------------------------------------------- MB-10-112 150.8 3.6 2.03 T ------------------------------------------------------------------------- MB-10-113 102.0 1.0 4.56 E 214.6 11.3 0.61 T ------------------------------------------------------------------------- MB-10-114 310.2 43.2 0.35 B-C1-C2 361.4 27.3 0.74 T 336.1 0.8 4.44 T 356.0 2.4 3.11 T ------------------------------------------------------------------------- MB-10-115 194.4 15.6 1.26 C-D1 193.2 6.2 2.45 C ------------------------------------------------------------------------- MB-10-117 117.4 2.4 33.19 2 ------------------------------------------------------------------------- * Results for Holes MB-10-108 and 109 are pending. Hole MB-10-116 was abandoned at 71 metres depth due to drilling difficulties.
Quality Control and Qualified Person
Reported intervals are in core lengths but are anticipated to approximate true width, except where structural complexities occur, as the holes were drilled nearly perpendicular to the principal local structural orientation.
Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones. The core was sealed and delivered by the drilling contractor to NioGold’s facilities located at the Norlartic mine site. The core was photographed for reference, logged and mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Half core samples were bagged, sealed and delivered to ALS Chemex in Val-d’Or, Quebec, an accredited laboratory. The remaining core is stored on site for reference. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50 gram pulp split. A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and field duplicates in the sample batches sent to the laboratory and a systematic re-assaying of samples returning values above 2 grams of gold per tonne by the fire-assay method using a gravimetric finish. As well, pulps grading above 0.5 grams of gold per tonne are sent to Bourlamaque Assay Laboratories Ltd. in Val-d’Or for check assaying.
Information of a scientific or technical nature in this news release has been reviewed by Martin Demers, P. Geo, Manager, Exploration, a Qualified Person as defined by National Instrument 43-101.
Additional Information
The attached sketch shows the geological context of the Marban Block property, the position of the drill holes and a plan view of the Marban Block deposit.
http://files.newswire.ca/734/NR110410_Sketch.pdf
About Aurizon
Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world’s most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol “ARZ” and on the NYSE Amex under the symbol “AZK”. Additional information on Aurizon and its properties is available on Aurizon’s website at http://www.aurizon.com.
Forward Looking Statements and Information
This news release contains “forward-looking statements” and “forward-looking information” within the meaning of applicable securities regulations in Canada and the United States (collectively, “forward-looking information”). The forward-looking information contained in this news release is made as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.
Specifically, this news release contains forward-looking information with respect to future exploration work on the Marban Block property. Forward-looking information contained in this news release is based on certain assumptions that the Company believes are reasonable, that the current price of and demand for gold will be sustained or will improve. However, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, the risk that actual results of exploration activities will be different than anticipated, that required supplies, equipment or personnel will not be available or will not be available on a timely basis or that the cost of labour, equipment or supplies will increase more than expected, that the future price of gold will decline, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources are not as estimated, that actual costs or actual results of reclamation activities are greater than expected; that changes in project parameters as plans continue to be refined may result in increased costs, of accidents, labour disputes and other risks generally associated with exploration, unanticipated delays in obtaining governmental approvals or financing or in the completion of exploration activities, as well as those factors and other risks more fully described in Aurizon’s Annual Information Form filed with the securities commission of all of the provinces and territories of Canada and in Aurizon’s Annual Report on Form 40-F filed with the United States Securities and Exchange Commission, which are available on Sedar at www.sedar.com and on Edgar at www.sec.gov/. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.
TraderPower Featured Companies
Top Small Cap Market News
- $SOBR InvestorNewsBreaks – SOBR Safe Inc. (NASDAQ: SOBR) Closes on $8.2M Private Placement
- $CLNN InvestorNewsBreaks – Clene Inc. (NASDAQ: CLNN) Announces Participation at Two Upcoming Investor Conferences
- $ATBHF Aston Bay Holdings Ltd. (TSX.V: BAY) (OTCQB: ATBHF) Releases Updated Report on Storm Copper Project Drilling Program
- $LGVN InvestorNewsBreaks – Longeveron Inc. (NASDAQ: LGVN) to Present at This Month’s Congenital Heart Surgeons’ Society Annual Meeting
- $LEXX InvestorNewsBreaks – Lexaria Bioscience Corp. (NASDAQ: LEXX) Begins Subject Dosing in Human Pilot Study #3 Evaluating Oral DehydraTECH-Processed Tirzepatide
- $FSTTF InvestorNewsBreaks – First Tellurium Corp. (CSE: FTEL) (OTC: FSTTF) Shares Additional Information on the PyroDelta Thermoelectric Generator, Relationship with Subsidiary
- $TMET.V Gold Stutters as Strong US Jobs Data Dampens Expectations of Large Rate Cuts
- $RFLXF JPMorgan Executive Says US Backlash Against ESG Is Exaggerated
- $SFWJ InvestorNewsBreaks – Software Effective Solutions Corp. (d/b/a MedCana) (SFWJ) Releases Report on Series of Acquisitions, Multiple Cannabis Licenses
- $EAWD IEA Hosts G20 Ministers, Influential Personalities to Discuss Clean and Affordable Energy Transition
Recent Posts
- $EAWD IEA Hosts G20 Ministers, Influential Personalities to Discuss Clean and Affordable Energy Transition
- $SFWJ InvestorNewsBreaks – Software Effective Solutions Corp. (d/b/a MedCana) (SFWJ) Releases Report on Series of Acquisitions, Multiple Cannabis Licenses
- $RFLXF JPMorgan Executive Says US Backlash Against ESG Is Exaggerated
- $TMET.V Gold Stutters as Strong US Jobs Data Dampens Expectations of Large Rate Cuts
- $FSTTF InvestorNewsBreaks – First Tellurium Corp. (CSE: FTEL) (OTC: FSTTF) Shares Additional Information on the PyroDelta Thermoelectric Generator, Relationship with Subsidiary
- $LEXX InvestorNewsBreaks – Lexaria Bioscience Corp. (NASDAQ: LEXX) Begins Subject Dosing in Human Pilot Study #3 Evaluating Oral DehydraTECH-Processed Tirzepatide
- $LGVN InvestorNewsBreaks – Longeveron Inc. (NASDAQ: LGVN) to Present at This Month’s Congenital Heart Surgeons’ Society Annual Meeting
- $ATBHF Aston Bay Holdings Ltd. (TSX.V: BAY) (OTCQB: ATBHF) Releases Updated Report on Storm Copper Project Drilling Program
Recent Comments
Archives
- October 2024
- January 2023
- June 2022
- December 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- February 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- October 2017
- September 2017
- August 2017
- July 2017
- June 2017
- May 2017
- April 2017
- March 2017
- February 2017
- January 2017
- December 2016
- November 2016
- October 2016
- September 2016
- August 2016
- July 2016
- June 2016
- May 2016
- April 2016
- March 2016
- February 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- March 2013
- February 2013
- January 2013
- December 2012
- November 2012
- October 2012
- September 2012
- August 2012
- July 2012
- June 2012
- May 2012
- April 2012
- March 2012
- February 2012
- January 2012
- December 2011
- November 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
- March 2011
- February 2011
- January 2011
- December 2010
- November 2010
- October 2010
- September 2010
- August 2010
- July 2010
- June 2010
- May 2010
- April 2010
- March 2010
- February 2010
- January 2010
- December 2009
- November 2009
- October 2009
- September 2009
- August 2009
- July 2009
- June 2009